You don't have javascript enabled. Good luck with that.
Pencarian
Komisi B DPRD DKI Uji Coba Kereta MRT Jakarta

Commission B Tries to Ride MRT Train

Today, Jakarta Council (DPRD) Commission B tests Mass Rapid Transit (MRT) train operation. This testing was done from Bundaran HI to Lebak Bulus with distance 16 kilometers for about 30 minutes.

We are proud to have a classy mass transport such as MRT

"We are proud to have a classy mass transport such as MRT," expressed Commission B Chairman, Abdurrahman Suhaimi, Wednesday (2/6).

PT MRT to Modify TB Simatupang Crossing Bridge

He hopes MRT officers can educate residents when MRT has been opened for public. According to him, education is essential because MRT operation system is automatic.

"People need to be educated before boarding the train," he said.

PT. MRT Jakarta Financial Director, Tuhiyat conveyed, MRT is planned to start operating commercially on March 24-31, 2019. But before the date, residents are invited to participate in this testing until end of this month.

"Its construction has reached 98 percent. It just needs some finishing," he mentioned.

Linked News
Popular News indeks
  1. Jakarta Government Guarantees Full Medical Care for Bantargebang Landslide Victims

    access_time09-03-2026 remove_red_eye1296 personDessy Suciati
  2. Commission E Supports Restricting Children's Access to Social Media

    access_time09-03-2026 remove_red_eye1126 personFakhrizal Fakhri
  3. Affordable and High-Quality Staple Goods Offered at Ramadan Bazaar

    access_time09-03-2026 remove_red_eye838 personAldi Geri Lumban Tobing
  4. Jakarta Planetarium Rolls Out Varied Shows for Eid al-Fitr Holiday

    access_time11-03-2026 remove_red_eye289 personAldi Geri Lumban Tobing
  5. Jakarta Speeds Up Flood Mitigation Efforts

    access_time08-03-2026 remove_red_eye285 personAldi Geri Lumban Tobing